Calculator
Price It Calculator
Price an exterior cladding job line by line. Enter take-off quantities, waste and your labor and material costs per square foot to get material and labor totals, labor cost per day and a sell price with your markup.
| Item | Project Description | Take Off | Waste Factor % | Total with Waste | Labor Cost/SQF | Total Labor | Material Cost/SQF | Material Total | Total Cost |
|---|---|---|---|---|---|---|---|---|---|
| Exterior Air/Barrier Vapor Barrier / Waterproofing | |||||||||
| Air-Vapor Barrier | |||||||||
| Tape | |||||||||
| Adhesive (If Applicable) | |||||||||
| Applicable Fasteners | |||||||||
| Flashings & Ventilation | |||||||||
| Vent Strip | |||||||||
| Drip Edge | |||||||||
| Window Drip Cap | |||||||||
| Specialty Flashing 1 | |||||||||
| Specialty Flashing 2 | |||||||||
| Specialty Flashing 3 | |||||||||
| Specialty Flashing 4 | |||||||||
| Specialty Flashing 5 | |||||||||
| Insulation & Strapping (If applicable) | |||||||||
| Insulation (If Applicable) | |||||||||
| Insulation Fasteners | |||||||||
| Vertical Strapping (If Applicable) | |||||||||
| Horizontal Strapping (If Applicable) | |||||||||
| Strapping Fasteners | |||||||||
| Cladding Product | |||||||||
| Siding Product 1 | |||||||||
| Siding Product 2 | |||||||||
| Siding Product 3 | |||||||||
| Siding Product 4 | |||||||||
| Siding Product 5 | |||||||||
| Siding Fasteners 1 | |||||||||
| Siding Fasteners 2 | |||||||||
| Touch up Paint 1 | |||||||||
| Touch up Paint 2 | |||||||||
| Trim Products | |||||||||
| Window Trim | |||||||||
| Door Trim | |||||||||
| Frieze Trim | |||||||||
| Outside Corner | |||||||||
| Inside Corner | |||||||||
| Specialty Trim 1 | |||||||||
| Specialty Trim 2 | |||||||||
| Soffit Fascia Eaves & Downspouts | |||||||||
| Soffit | |||||||||
| Fascia | |||||||||
| Eavestrough | |||||||||
| Downspouts | |||||||||
| Accessories | |||||||||
| Fasteners | |||||||||
| Custom Fields | |||||||||
| Custom Field 1 | |||||||||
| Custom Field 2 | |||||||||
| Custom Field 3 | |||||||||
| Custom Field 4 | |||||||||
| Custom Field 5 | |||||||||
Project Details
Project Summary
- Total Material Cost
- $0.00
- Total Labor Cost
- $0.00
- Total Material & Labor
- $0.00
- Labor Cost/Day
- $0.00
- Markup Amount
- $0.00
- Sell Price
- $0.00
How it's calculated
- Total with Waste = Take Off + (Take Off × Waste Factor %)
- Total Labor = Take Off × Labor Cost/SQF
- Material Total = Total with Waste × Material Cost/SQF
- Total Cost = Material Total + Total Labor
- Labor Cost/Day = Total Labor Cost ÷ Estimated Working Days
- Markup Amount = Total Material & Labor × Markup Percentage
- Sell Price = Total Material & Labor + Markup Amount
What it covers
Line items for the air/vapor barrier and waterproofing, flashings and ventilation, insulation and strapping, cladding, trim, and soffit, fascia, eaves and downspouts, plus five custom lines you can name yourself.
Your estimate is saved in this browser, so it is still there when you come back on the same device. Use Export to CSV to keep a copy or open it in a spreadsheet.